Our Data Centers
We build and operate digital infrastructure powered by stranded energy.
Up to 15 modular data center sites with 20 MW total capacity, in progress.
As demand for computing and blockchain infrastructure grows, GasMINE currently operates Foster Farms, Hull Lane, and the Fash Facility, with 5MW total capacity.
The GasMINE Approach
We follow a structured energy-to-digital model that transforms stranded natural gas into scalable digital infrastructure. Each stage is designed to reduce waste, control costs, and convert energy directly into long-term digital value.









