Where Energy Meets Digital Infrastructure

Some Affordable Pricing Plans for you!

GasMINE converts stranded natural gas into reliable power, enabling scalable digital infrastructure across computing, blockchain, and emerging technologies.

Converts

Stranded gas into low cost electricity

Powers

Bitcoin mining and AI computing

Deploys

Scalable modular infrastructure

Operates

"End to End" - from gas to data centers

Supports

Blockchain and Tokenization developments

Our Story

AI computing and Bitcoin mining are rapidly increasing the world’s need for electricity. The global demand for powering data centers is expected to be more than double by 2030. This surge is driven by energy-intensive data centers that are required to run at high capacity 24/7. At the same time, billions of cubic feet of stranded and flared natural gas are wasted every year, an untapped energy resource with enormous potential.

GasMINE was founded from a background of oil and gas production in Texas, USA to leverage the availability of stranded gas into low-cost electricity that can power operational data centers. We turn a waste product into directable electricity while reducing environmental emissions and powering the digital infrastructure the next generation economy demands.

Our approach embraces: Gas to electricity conversion, modular computing infrastructure, and strategic partnerships to unlock new opportunities related to Bitcoin mining and AI application hosting.

Video Image

Our Projects

Completed Projects (2025)
0

Operational sites at 3 locations in Texas including proof of concept completed in March 2025.

Completed Projects (2025)
0

Operational sites at 3 locations in Texas including proof of concept completed in March 2025.

Completed Projects (2025)
0

Operational sites at 3 locations in Texas including proof of concept completed in March 2025.

Planned Projects (2026)
0

Joint venture projects ranging from 0.5MW - 4MW at locations throughout Texas.

Planned Projects (2026)
0

Joint venture projects ranging from 0.5MW - 4MW at locations throughout Texas.

Planned Projects (2026)
0

Joint venture projects ranging from 0.5MW - 4MW at locations throughout Texas.

Total Capacity (2026)
0MW

Capacity based on Stranded Gas reserves and availability, for mining and other digital applications.

Total Capacity (2026)
0MW

Capacity based on Stranded Gas reserves and availability, for mining and other digital applications.

Total Capacity (2026)
0MW

Capacity based on Stranded Gas reserves and availability, for mining and other digital applications.

Our Awesome Team

We bring together expertise across energy, infrastructure, and technology to develop scalable solutions that power the next generation of digital systems.

Team Image
Peter Oyewole

Founder GasMINE

Team Image
Peter Oyewole

Founder GasMINE

Team Image
Peter Maitala

President

Team Image
Peter Maitala

President

Team Image
Vikrant Lakhanpal

Senior Petroleum Engineer

Team Image
Vikrant Lakhanpal

Senior Petroleum Engineer

Team Image
Benjamin Sarumi

Business Developer

Team Image
Benjamin Sarumi

Business Developer

Team Image
Carlos Garcia

Product Designer

Team Image
Carlos Garcia

Product Designer

Team Image
Placeholder

Position

Team Image
Placeholder

Position

CTA Image
CTA Image
CTA Image
CTA Image
CTA Image
CTA Image

Let’s Build the Future of Energy Together

Let's Build Something
Amazing Together

Ready to build the future of energy and digital infrastructure?

Contact us

Connect with us via our socials

GASMINE INC

© All Right Reserved by GASMINE INC - 2026

Ready to build the future of energy and digital infrastructure?

Contact us

Connect with us via our socials

GASMINE INC

© All Right Reserved by GASMINE INC - 2026